Interconnection Intelligence automates the engineering-compliance work behind an interconnection request, from the first package to the final cure.

Interconnection Intelligence,Module by Module.

Every interconnection request: packaged, validated and protected in the queue. Previews below use sample data.

Generate

IR Package Generation

Specialist agents turn project parameters and equipment datasheets into drawings, network models and a submission-ready package for engineer sign-off.

IR Package Generation

Application-grade interconnection packages, drafted from your project data.

MAPLE RUN SOLAR · PJM CYCLE 1 (2026)

Compliance pre-check13/15 PASS
Cross-document consistency4/4 OK
Findings flagged for engineer review2
Ask GreenBridge

Is the package ready to submit?

Nearly. All 11 artifacts are built and consistent; two pre-check findings need an engineer’s review first.

Cure

Deficiency Handling & Curing

Read each deficiency notice, pinpoint the fix, apply it in plain English, and regenerate the package before the cure clock runs out.

Deficiency Handling & Curing

Deficiency notices read, pinpointed and cured in plain English.

MAPLE RUN SOLAR · PJM DEFICIENCY NOTICE

PJM-MOD-014: main transformer winding is Y-YCURED
PJM-MOD-021: rated 138 MVA vs 150 MW plantCURED
Cure clockSTOPPED
Ask GreenBridge

What did PJM flag?

Two items: a Y-Y transformer winding where PJM requires Y-Delta-Y, and a 138 MVA rating below the 150 MW plant. Both are cured.

Protect

Queue Position Assurance

Treat every queue position as a managed asset: see what it is worth, what is at risk, and what continuous management protects.

Queue Position Assurance

Every queue position tracked as a managed asset, with its value at risk.

MAPLE RUN SOLAR · PJM CYCLE 1 (2026)

Embedded NPV$11.3M
NPV at risk · 39% probability of loss$4.4M
Protected under assurance$3.0M
Ask GreenBridge

What is this queue position worth, and what is at risk?

$11.3M of embedded NPV, with $4.4M at risk. Assurance protects $3.0M for about $141K a year.

Operate With Decisions,Not Dashboards.

Join renewable energy leaders managing 5,600+ MW with GreenBridge. See how connected intelligence could work across your portfolio.