Cure interconnection deficiency notices fast

Read each deficiency notice, pinpoint the fix, apply it in plain English, and regenerate the package before the cure clock runs out.

Deficiency Handling & Curing

Deficiency notices read, pinpointed and cured in plain English.

MAPLE RUN SOLAR · PJM DEFICIENCY NOTICE

PJM-MOD-014: main transformer winding is Y-YCURED
PJM-MOD-021: rated 138 MVA vs 150 MW plantCURED
Cure clockSTOPPED
Ask GreenBridge

What did PJM flag?

Two items: a Y-Y transformer winding where PJM requires Y-Delta-Y, and a 138 MVA rating below the 150 MW plant. Both are cured.

Sample data

What Deficiency Handling & Curing does

Notice parsing

Each finding is tied to the exact document and value at fault.

Plain-English cures

Describe the fix and the models and drawings update to match.

Cure-clock tracking

Deadlines are watched until the notice is cleared.

What it reads

Utility deficiency noticesGenerated packageTariff rules

Keep a fixable deficiency from becoming a withdrawn application.

Questions about Deficiency Handling & Curing

What data does Deficiency Handling & Curing use?

Deficiency Handling & Curing reads utility deficiency notices, generated package, and tariff rules.

Which part of the platform is Deficiency Handling & Curing?

It is part of Interconnection Intelligence, alongside IR Package Generation and Queue Position Assurance.

How do I see Deficiency Handling & Curing on my own fleet?

Book a demo and we’ll run it against your portfolio.